EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sport
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (60)
Research
Workshop
- (1)
Empennage
- (1)
Fuselage
- (22)
-
Baggage compartment...
-
Riveted bottom...
-
Cheek and joggle...
-
Fuselage construction
-
Removed Elevators...
-
Installed elevators...
-
Assembled and...
-
Installed rudders...
-
Bottom skin fitting,...
-
Upper panel, seat...
-
Fit front cheek...
-
Fit vertical...
-
Fit and up drilled...
-
Fit horizontal tail...
-
Joining tail cone to...
-
Started fitting...
-
Tailcone final assembly
-
Tail spring mount...
-
Worked on assembly...
-
Assembled side...
-
Assembled upper...
-
Fitted and assembled...
Firewall
Tail Feathers
Wings
- (22)
Controls
- (11)
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
Fuel System
- (2)
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Barry Cole
-
Project:
Sport Performance - Panther
-
VIEW REPORTS
Total Hours:
562
Total Flight Time:
4.6
Start/Last Date:
Jan 01, 2018 - No Finish Date
Engine:
Lycoming O-320
Friendly URL:
https://eaabuilderslog.org?s=Sport
Home or Last Project Picture
Oct 15, 2019
Removed Elevators and riveted inner ribs and drive horns onto inner ribs. Reinstalled elevators and re leveled. Drilled hole in drive horn for heim bearing installation per build manual.
- (5 hours)
Category: Fuselage
Removed Elevators and riveted inner ribs and drive horns onto inner ribs. Reinstalled elevators and re leveled. Drilled hole in drive horn for heim bearing installation per build manual.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.